FoodVision @ Mandai Freehold Ramp Up Food Factory

FoodVision @ Mandai is a Freehold Food Factory with Ramp Up. Food Vision units are from 1668 sqft to 1765 sqft, it’s modular architecture is designed for today’s vibrant and exciting food and beverage industry. Units comes with its own exhaust and refuse chute. Internal floor of units are by design sunken for provision for cold room or kitchen operation. Businesses will have direct access to the units with loading and unloading at doorsteps.      

Building NameFood Vision @ Mandai 万礼福盛
TypeRamp-up B2 Food Factory
DeveloperMandai Estate Development Pte Ltd
(JV between EL Development & Sim Lian Development)
Location21 Mandai Estate
District25
TenureFreehold
Expected Date of TOP31 Dec 2026
No. of Storeys10
No of Units114 food factory units + 1 staff canteen (Canteen use will lapse on 27 July 2027. Upon expiry of the temporary permission for the staff canteen, the premises shall be used for industrial purposes. The Owner/ Canteen operator has to apply to the relevant Competent Authorities to renew the use, subject to approval)
Floor to floor height1. 1st & 2nd : 5.95m (Headroom: 4.5m with localised bulkheads for services)
2. 3rd to 10th : 5.25m (Headroom: 3.8m with localised bulkheads)
Ramp width2-way 7.7m wide
Driveway width2-way 7.6m to 9m wide
Approved vehicles<7.5m rigid framed vehicles
Sunken floor175mm drop
Refuse ChuteDedicated refuse chute for every unit
Roller Shutter1. 1st & 2nd : 4.0m (W) x 4.6m (H)
2. 3rd to 10th : 4.0m (W) x 4.1m (H)
Floor loading1. All Driveway/Ramp/Loading/Unloading Areas : 10kN/m2
2. 1st Storey Units : 15kN/m2
3. 2nd Storey Units : 12.5kN/m2
4. 3rd to 10th Storey Units : 10kN/m2
No. Parking Lots1. Lorry : 6
2. Car : 50
3. Bicycle : 54
4. Motorcycle : 3
Lift provisions3 nos. of passenger lifts
2 nos. of cargo lifts (3 tonnes) with separation for raw & cooked food
Electrical supply1st & 2nd : 150A (3 Phase)
3rd to 10th : 100A (3 Phase)
Provision for upgrade on first come first serve basis; all requests shall be raised to Electrical PE for confirmation.
Gas supplyTown gas
Sanitary provision1 no. of floor trap & provision for sampling sump.
Internal sanitary line can be formed below raised floor system which will be under tenancy works.
Fire protection/ fightingRestriction to amalgamation of these units due to smoke compartment:
1. 02 to 10-03 (A2) & 02 to 10-04 (A5)
Possible if A2 is provided with entrance door & shutter are fire rated.
Kitchen Exhaust Duct (KED)Dedicated KED for every unit
MVMV to designated units:
1. B1
2. A1a, A2a, A5a
3. A1, A2, A5
and all unit toilets
error: Content is protected !!