FoodVision @ Mandai Freehold Ramp Up Food Factory
FoodVision @ Mandai is a Freehold Food Factory with Ramp Up. Food Vision units are from 1668 sqft to 1765 sqft, it’s modular architecture is designed for today’s vibrant and exciting food and beverage industry. Units comes with its own exhaust and refuse chute. Internal floor of units are by design sunken for provision for cold room or kitchen operation. Businesses will have direct access to the units with loading and unloading at doorsteps.
Building Name | Food Vision @ Mandai 万礼福盛 |
Type | Ramp-up B2 Food Factory |
Developer | Mandai Estate Development Pte Ltd (JV between EL Development & Sim Lian Development) |
Location | 21 Mandai Estate |
District | 25 |
Tenure | Freehold |
Expected Date of TOP | 31 Dec 2026 |
No. of Storeys | 10 |
No of Units | 114 food factory units + 1 staff canteen (Canteen use will lapse on 27 July 2027. Upon expiry of the temporary permission for the staff canteen, the premises shall be used for industrial purposes. The Owner/ Canteen operator has to apply to the relevant Competent Authorities to renew the use, subject to approval) |
Floor to floor height | 1. 1st & 2nd : 5.95m (Headroom: 4.5m with localised bulkheads for services) 2. 3rd to 10th : 5.25m (Headroom: 3.8m with localised bulkheads) |
Ramp width | 2-way 7.7m wide |
Driveway width | 2-way 7.6m to 9m wide |
Approved vehicles | <7.5m rigid framed vehicles |
Sunken floor | 175mm drop |
Refuse Chute | Dedicated refuse chute for every unit |
Roller Shutter | 1. 1st & 2nd : 4.0m (W) x 4.6m (H) 2. 3rd to 10th : 4.0m (W) x 4.1m (H) |
Floor loading | 1. All Driveway/Ramp/Loading/Unloading Areas : 10kN/m2 2. 1st Storey Units : 15kN/m2 3. 2nd Storey Units : 12.5kN/m2 4. 3rd to 10th Storey Units : 10kN/m2 |
No. Parking Lots | 1. Lorry : 6 2. Car : 50 3. Bicycle : 54 4. Motorcycle : 3 |
Lift provisions | 3 nos. of passenger lifts 2 nos. of cargo lifts (3 tonnes) with separation for raw & cooked food |
Electrical supply | 1st & 2nd : 150A (3 Phase) 3rd to 10th : 100A (3 Phase) Provision for upgrade on first come first serve basis; all requests shall be raised to Electrical PE for confirmation. |
Gas supply | Town gas |
Sanitary provision | 1 no. of floor trap & provision for sampling sump. Internal sanitary line can be formed below raised floor system which will be under tenancy works. |
Fire protection/ fighting | Restriction to amalgamation of these units due to smoke compartment: 1. 02 to 10-03 (A2) & 02 to 10-04 (A5) Possible if A2 is provided with entrance door & shutter are fire rated. |
Kitchen Exhaust Duct (KED) | Dedicated KED for every unit |
MV | MV to designated units: 1. B1 2. A1a, A2a, A5a 3. A1, A2, A5 and all unit toilets |